# How to Ship Custom Apparel & Corporate Gifts Internationally from India

Source: https://groovstation.com/groov-blog/how-to-ship-custom-apparel-internationally-from-india/
Published: 2026-09-22 · Updated: 2026-11-02 · Author: Groov Station team

**Quick answer:** To export custom apparel from India you need an IEC, commercial invoice, packing list, correct HS code and a freight mode (air for speed, sea for volume). Typical delivery is 5–14 days by air depending on destination.

Exporting custom apparel and gifts from India is easier than most buyers fear — if you know the steps. We ship t-shirts, polos, hoodies, uniforms and gift sets to clients in the Middle East, the UK, Europe, North America and Asia, and the same questions come up every time: what paperwork is needed, how long will it take, who pays the duty and how do we avoid delays? This guide to **shipping custom apparel and corporate gifts internationally from India** answers them in plain language.




## Step 1: Confirm product, quantity and destination


Start with a clear specification: product, fabric, branding, quantity, size split and the country (and city) of delivery. Destination matters for duties, labelling rules and transit time. Textile and apparel often have country-specific labelling requirements (fibre content, country of origin, care label); ask your importer what applies.




## Step 2: Mockup, sample and approval


Overseas buyers should always approve a physical sample. We send a free digital mockup, then courier a sample so you can check fabric, print quality and fit before committing to bulk production. This one step prevents most export disputes.




## Step 3: Production and quality control


Production typically takes 7–20 working days depending on product and quantity, with the same multi-stage quality checks we apply to domestic orders. Pack with export in mind: sturdy cartons, moisture protection and carton-wise packing lists.




## Step 4: Export documentation




- **IEC** – Importer-Exporter Code, issued by the [Directorate General of Foreign Trade](https://www.dgft.gov.in/).

- **Commercial invoice** – value, description, Incoterm and HS code.

- **Packing list** – cartons, weights, contents.

- **HS code** – apparel generally falls under chapters 61 and 62 of the [Harmonized System](https://en.wikipedia.org/wiki/Harmonized_System).

- **Certificate of origin** where required for preferential duty.


We prepare these documents and coordinate with the freight forwarder or courier.




## Step 5: Choose the shipping mode



| Mode | Transit (typical) | Best for |
| --- | --- | --- |
| Express courier | 3–7 days | Samples, small or urgent orders |
| Air freight | 5–10 days | Mid-size orders |
| Sea freight | 3–6 weeks | Large volumes, cost-sensitive |


These are typical ranges; actual times depend on route, season and customs.




## Step 6: Incoterms — who pays what


Incoterms define responsibilities between buyer and seller. Common terms include EXW, FOB, CIF, DAP and DDP. For apparel and gifts, many buyers prefer DAP (delivered at place, importer clears and pays duty) or DDP (supplier handles duty) depending on market. The [ICC Incoterms rules](https://iccwbo.org/business-solutions/incoterms-rules/) explain each term; agree the term in writing before production.




## Step 7: Customs clearance and duties


Duties and taxes at destination vary by country and by the product’s classification. The importer is typically responsible for clearance and local VAT or GST. We provide accurate descriptions and values to avoid delays. Check your own country’s customs website for current rates and rules.




## Step 8: Tracking and delivery


We share tracking numbers and, for multi-address orders, individual parcel tracking. For corporate gifts abroad, include recipient phone numbers and address details exactly as the courier requires.




## Timeline example



| Stage | Time |
| --- | --- |
| Mockup | 24 hours |
| Sample courier and approval | 5–10 days |
| Production | 7–20 working days |
| Air freight and clearance | 5–14 days |




## Common mistakes to avoid




- Wrong HS code or vague product description.

- Incomplete recipient addresses or phone numbers.

- No agreed Incoterm.

- Leaving festival orders late; international lead times are longer.




## Where we deliver


See [all delivery locations](/locations/), including [Dubai](/corporate-tshirts-in/dubai/), [the UK](/corporate-tshirts-in/united-kingdom/), [the USA](/corporate-tshirts-in/united-states/), [Canada](/corporate-tshirts-in/canada/) and [Singapore](/corporate-tshirts-in/singapore/), and read our [worldwide delivery guide](/guides/worldwide-delivery-corporate-apparel-gifts/). Ready to start? [Contact us](/contact-us/).

## Ordering from India for the first time: a short checklist

- Decide the Incoterm and shipping mode before you accept the quote.

- Check your country’s labelling and import rules for textiles.

- Approve a physical sample by courier.

- Confirm the HS code with your customs broker.

- Agree payment terms and currency; allow for bank charges.

- Plan a buffer for customs inspection, especially around holidays.

## Why buyers choose Indian manufacturing

India combines a deep textile supply chain, skilled labour and strong customisation capability, with competitive costs and English-language communication. For brands who need embroidery, printing and small-to-mid runs without compromising quality, it is a practical option — provided you work with a supplier who is transparent about samples, timelines and paperwork.

## FAQs

**Do you handle export paperwork?**
Yes — invoice, packing list, HS codes and shipment coordination.

**How long does international delivery take?**
Production of 7–20 working days plus 5–14 days by air, depending on destination.

**Who pays import duty?**
Typically the importer under the agreed Incoterm; DAP or DDP can be quoted.

**Can you send samples first?**
Yes, by express courier.

